0
|
SM18 Crab Cryomodule V1
|
|
|
|
|
1
|
SM18 Cryo stop
|
|
|
|
|
2
|
SM18 Christmas Stop
|
|
|
|
|
3
|
M7 Services
|
|
|
|
|
4
|
M7: EN-EL Cabling
|
|
|
|
|
5
|
M7: Access system validation
|
|
|
|
|
6
|
M7: Access system validation
|
|
|
|
|
7
|
M7: Access system validation
|
|
|
|
|
8
|
Scafolding
|
|
|
|
|
9
|
Cable protection
|
|
|
|
|
10
|
Helium evauation line re-mounting
|
|
|
|
|
11
|
M7: Demineralised water removal
|
|
|
|
|
12
|
M7: Demineralised water installation
|
|
|
|
|
13
|
M7: Flooring+ marking
|
|
|
|
|
14
|
M7: Rack powering
|
|
|
|
|
15
|
M7 :Network
|
|
|
|
|
16
|
M7: EN Cabling - additional
|
|
|
|
|
17
|
M7: EN Cabling - optical fibre
|
|
|
|
|
18
|
M7: Cryo Pre-Installation Preparation
|
|
|
|
|
19
|
M7: Installation of Valve Box & Service Box
|
|
|
|
|
20
|
Mechanical Installation of Valve Box
|
|
|
|
|
21
|
Cabling and Connections of Valve Box
|
|
|
|
|
22
|
Mechanical Installation of Service Box
|
|
|
|
|
23
|
Testing: Pressure tests
|
|
|
|
|
24
|
Commission Valve Box & Service Box
|
|
|
|
|
25
|
M7: Installation of Crab cryomodule
|
|
|
|
|
26
|
Transport to bunker
|
|
|
|
|
27
|
Alignment of Crab cryomodule
|
|
|
|
|
28
|
Alignement validation
|
|
|
|
|
29
|
Transport activity
|
|
|
|
|
30
|
Crab - Cryogenic test & preparation
|
|
|
|
|
31
|
Welding of internal lines: CM and SM
|
|
|
|
|
|
Kzystof
|
|
|
|
|
32
|
Leak test of new conections
|
|
|
|
|
|
Kzystof
|
|
|
|
|
33
|
Insulation and welding of interconnections external envelope
|
|
|
|
|
|
Kzystof
|
|
|
|
|
34
|
Vacuum pumping
|
|
|
|
|
|
Kzystof
|
|
|
|
|
35
|
Leak & Pressure test under vacuum
|
|
|
|
|
|
Kzystof
|
|
|
|
|
36
|
Crab Slow Controls
|
|
|
|
|
37
|
Preparation of Slow Controls Hardware
|
|
|
|
|
38
|
Slow controls - installation
|
|
|
|
|
39
|
Install hardware in racks
|
|
|
|
|
40
|
Slow controls - pre-commissioning
|
|
|
|
|
41
|
test communication: tuner motors test box
|
|
|
|
|
42
|
supervision SILECS + FESA + GUI
|
|
|
|
|
43
|
implement SILECS + FESA + GUI
|
|
|
|
|
|
Niall
|
|
|
|
|
44
|
Test with David
|
|
|
|
|
45
|
test external signals (VAC CRYO ACCESS)
|
|
|
|
|
46
|
test connections with LLRF & RF 1kW amplifier
|
|
|
|
|
47
|
Slow controls - commissioning with CM
|
|
|
|
|
48
|
Connect all signals & retest tuner motor control
|
|
|
|
|
49
|
commission switch on procedure with RF power
|
|
|
|
|
50
|
CRAB LLRF
|
|
|
|
|
51
|
V3: Test 1 -Inital Test + Tuner loop
|
|
|
|
|
52
|
Pupmping Line leak check at 2K
|
|
|
|
|
53
|
Preparation of DQW_PoP after EP
|
|
|
|
|
54
|
LLRF Test Preparation: DQW_PoP + Tuner
|
|
|
|
|
55
|
LLRF Cold Test: DQW_PoP + Tuner
|
|
|
|
|
56
|
V3: Recommissioning of cryo operation
|
|
|
|
|
57
|
V3: Test 2a - Cavity + Tuner Loop
|
|
|
|
|
58
|
V3: Test 2b - Cavity + Tuner Loop
|
|
|
|
|
59
|
V3: Test 3 - Full LLRF test
|
|
|
|
|
60
|
V4: Crab Cavity LLRF test
|
|
|
|
|
61
|
LLRF Software Framework
|
|
|
|
|
62
|
Cavity Loop FESA class development
|
|
|
|
|
63
|
RF-CS: Update of FESA Class Generator
|
|
|
|
|
64
|
Cavity Loop FESA class development
|
|
|
|
|
65
|
Cavity Loop ready
|
|
|
|
|
66
|
Niall: Absence
|
|
|
|
|
67
|
Develop Function Generator FESA Class for FEC in SPS
|
|
|
|
|
68
|
Develop: Inspector Application
|
|
|
|
|
69
|
Implimentation of procedures (GD + SEL)
|
|
|
|
|
70
|
Develop & Deploy Protoype SPS Crab Sequencer
|
|
|
|
|
71
|
Cryomodule Cold Test
|
|
|
|
|
72
|
Cryo Commissioning
|
|
|
|
|
73
|
Cavity Cooldown to 150K, ∆T<50K
|
|
|
|
|
74
|
Cooldown to 50 K, as fast as possible with ∆T<50K
|
|
|
|
|
75
|
Shield Cooldown
|
|
|
|
|
76
|
Cavities cooldown to 4.5K
|
|
|
|
|
77
|
Filling with LHe
|
|
|
|
|
78
|
Cavities cooldown to 2K
|
|
|
|
|
79
|
RF Testing ?
|
|
|
|
|
80
|
Warm up 2K -> 4.5 K
|
|
|
|
|
81
|
M7: Crab - End of ColdTest
|
|
|
|
|
82
|
M7: Crab Exit from Tests
|
|
|
|
|
83
|
M7: Crab - Exit from tests
|
|
|
|
|
84
|
Warm up to 300K with ∆T<50K
|
|
|
|
|
85
|
Cutting Jumper connection
|
|
|
|
|
86
|
Cutting Service box connection
|
|
|
|
|
87
|
M7: Crab -Final alignment steps
|
|
|
|
|
88
|
Alignement survey AT 401
|
|
|
|
|
|
Mateusz
|
|
|
|
|
89
|
Alignement survey RF
|
|
|
|
|
|
Mateusz
|
|
|
|
|
90
|
Alignement adjustment
|
|
|
|
|
|
Mateusz
|
|
|
|
|
91
|
Transport preparation
|
|
|
|
|
|
Giovanna (BE-RF)
|
|
|
|
|
92
|
CM Delivered ready for transport
|
|
|
|